_
Mining Concrete Processing
An efficient and reliable rail transport system in underground mining has to be maintained periodically for operable tracks. The KRF 40 has been specially designed for e.g. digging maintenance work on the track bed. With the sensitive control, drainage ditches and tracks can be cleared again. The KRF 40 can be customized to many requirements with many equipment options such as with a track gauge of 750 mm or optionally with 900 mm, a camera system, or also with a hydraulic hammer.